Waynesville Bridge

Flood Study and Bridge

Evaluation of major flood event, recommendations to mitigate future flooding, design and construction phase engineering of a new bridge.

Funding

Flood Study – City Funds
Bridge Construction – FEMA Hazard Mitigation Grant/City Funds

Cost

Flood Study – $75,600
Bridge Construction – $315,000

Client

City of Waynesville, Missouri

Eagle Creek Park

Eagle Creek State Park

The Eagle Creek improvement project consisted of multiple sidewalks, a large patio area, a landscape block retaining wall, access to the patio with steps as well as an ADA vertical lift, and 57 boat slips with electrical hookups and ADA accessibility.

Funding

State of Illinois (CDB/IDNR)

Cost

$1,750,000

Client

Capital Development Board and Illinois Department of Natural Resources (Using Agency)

Chandlerville Water Treatment Plant

Chandlerville Water Treatment

Water Treatment facility construction included a 200 gpm iron and manganese removal filtration plant, raw and finished water connecting mains, two raw water detention tanks, and the addition of an emergency generator.

Size

200 GPM

Funding

IEPA Loan/DCEO Grant

Cost

$1,263,000

Client

City of Chandlerville, Illinois

Winchester Water Treatment Plant

Winchester Water Treatment

Water Treatment upgrades included construction of a new 500 gpm well and filtration plant, a Zeolite softening building, a SCADA system, and an emergency generator.

Size

500 GPM

Funding

IEPA Loan/Grant

Cost

$2,384,000

Client

City of Winchester, Illinois

Brasher Wastewater

Brashear WWTP Improvements

  • Sludge removal from existing lagoon
  • Increase in storage capacity
  • Conversion to Fixed Head Spray Irrigation system
  • Eliminated the existing NPDES permit requirements for effluent disinfection and the anticipated requirement for ammonia removal.

Funding

$150,000 CDBG Grant
$660,000 MDNR SRF Grant
$485,000 MDNR SRF Loan

Cost

$1,295,000

Client

City of Brashear, Missouri
MacMurray College Football Field and Track

Football Field and Track

This project provided civil/site services included new home bleachers and press box and the relocation of home bleachers. There was also extensive grading of the banks to improve maintenance and aesthetics.

Funding

MacMurray College funds
Alumni donations
Illinois Legislative Initiative Grant

Cost

$750,000

Client

MacMurray College – Jacksonville, IL

Dallas City Sewer

Dallas City Sanitary Sewer

Rehabilitation and replacement of the city’s original 1900’s vitrified clay pipe sanitary sewer mains.

  • 16,000 LF Sewer Main Rehab
  • 500 LF Sewer Replacement
  • 165 Lateral Connections Grouted
  • 45 Manholes Rehabilitated

Funding

$450,000 IL DCEO Grant
30% IEPA SRF principal Forgiveness
1.32% IEPA SRF Loan

Cost

$1.2 Million

Client

City of Dallas City, IL

SMG Water Tank

SMG Water Cooperative

50,000 gallon water storage tank
Above grade booster pump station and building
SCADA/telementry system
314,000 LF of 6″, 4″, and 3″ PVC water main

Funding

USDA-RD
DCEO

Cost

$2,778,000

Client

Scott, Morgan, Greene (SMG) Water Cooperative

IC Bruner Rec Center

Bruner Fitness and Recreation Center

Civil/site services that included solutions for underground storage for excess storm water runoff, support utilities, a sanitary sewer service, grading for 2 separate entrances, parking facilities, landscaping and a plaza area.

Size

150,000 S.F.

Funding

Illinois College Funds

Cost

$23,000,000

Project Duration

20 months

Client

Illinois College – Jacksonville, Illinois

Weaver Medical

Weaver Medical

Development of two (2) professional office buildings.

  • Surveying
  • Prepared site layout including water distribution mains
  • Relocation of the existing sanitary sewer mains that were in conflict with the proposed buildings and service connections to the main
  • Storm water collection and retention
  • Parking lot layout and design
  • Landscaping

Funding

Private

Client

Weaver Holdings – Kirksville, Missouri