Carrollton Water Tank

.25 MG pedesphere elevated water storage tank

Site piping and site work

Demo of existing tank

Funding

IEPA loan
Principal Forgiveness

Cost

$1,695,000

Client

City of Carrollton, Illinois

Taylorville Lift Station

Taylorville Lift Station Improvements

Improvements consisted of the upgrade/rehabilitation of nine (9) lift stations. B&A provided on-site construction observation; project shop drawing review; and construction contract management and documentation, including review of pay estimates and change orders in accordance with City and Illinois EPA-SRF Standards and Practices.

Funding

IL DCEO/CDAP grant
IEPA SRF low interest loan
USDA-RD loan

Cost

$1,450,000

Client

City of Taylorville, Illinois

Passavant ER

Passavant Emergency Addition

B&A  provided civil/site services including topographic and property surveys, subsurface utility locating and surveying, site grading, landscaping, parking area lighting, site utilities, parking areas, traffic movements, ambulance drive, entrance loading/unloading area, retaining walls and ADA accessibility.

B&A also prepared stage demolition and construction plans to allow the existing facility to remain operational throughout the construction of the new addition.

Size

22,000 SF

Funding

Passavant Area Hospital

Cost

$11 million

Client

Passavant Area Hospital – Jacksonville, IL

Unionville Sewer

Unionville Sewer Collection System Improvements

Assistance in annual reporting to MoDNR to identify and mitigate sources of inflow and infiltration to the wastewater collection system. Recommendations included manhole rehabilitation, sewer main replacement, sewer main lining, and construction of a relief sewer.

Funding

MoDNR CWSRF Grant – $777,000
MoDNR CWSRF low interest loan- $777,000
CDBG Grant – $500,000

Cost

$1,900,000

Client

City of Unionville, Missouri

Chapin WWTP

Chapin WWTP Improvements

Removal of all lagoon and sand filter sludge, replacement of the existing aeration system with a new fine bubble easily cleaned and maintained system.

Funding

DCEO Grant – $483,600

Cost

$553,100

Client

Village of Chapin, Illinois

Safe Routes to School Sidewalk Improvements

Safe Routes to School

The Safe Routes To School (SRTS) program assists communities who want to create a safe and healthy walking/biking environment for its students. Each SRTS project included the removal, replacement, and construction of sidewalks. All sidewalk ramps at intersections are ADA compliant.

Funding

Federal Grant
Local Funds

Client

Waverly, IL; Virden, IL; Divernon, IL

Chandlerville Water Tank

Chandlerville Water Tank

The project consisted of removal of the old storage tank and foundation, installation of a new 150,000 gallon potable water standpipe, site piping, and, electrical and telemetry transfers.

Funding

IPEA SRF Low Interest Loan
DCEO Grant

Cost

$397,000

Client

Village of Chandlerville, Illinois

Franklin Water Tank

Franklin Water Tank

The project included a new 125,000 gallon elevated water storage tank with necessary 6″ and 8″ transmission mains and necessary upgrades to existing SCADA/telemetry system.

Funding

IPEA Loan/DCEO/CDAP Grant

Cost

$970,524

Client

City of Franklin, Illinois

Cherokee Water Tank

Cherokee Tank Rehabilitation

B&A assisted the City with the successful application to the Illinois Environmental Protection Agency (IEPA) for a low interest loan. The project included the complete removal of the interior and external paint coating system along with the application of a new painting system.

Funding

IPEA Low Interest Loan
Debt Forgivness

Cost

$629,550

Client

City of Taylorville, Illinois