Buchanan and Cody Funeral Home

Buchanan & Cody

This project consisted of topographic and boundary survey to provide a base map for design. Final design included construction plans and technical specification for providing parking for 161 vehicles, site lighting and landscaping, sidewalks, site entrances and erosion control.

Cost

$2.3 Million

Funding

Private

Client

Buchanan & Cody Funeral Homes, Jacksonville, Illinois

ATSU Kirksville

A.T. Still University

Site/civil services for a new dental school for A.T. Still University.

Duration

24 months

Funding

A.T. Still University

Cost

$17.2 Million

Client

A.T. Still University – Kirksville, Missouri

Macomb City Bus Transfer and Parking

Macomb City Center Transfer & Parking

Preparation of construction plans and contract documents for a 60 vehicle parking lot, a pedestrian canopy with wind shields, lighting, support electrical, sidewalks, landscaping, and fencing.

Duration

5 months

Cost

$570,000

Client

McDonough County Public Transportation

Whipple Hall

Whipple Hall

Services included structural inspection, structural design and detailing of the conversion of the 1882 structure to a combined use library, classroom and office.

Duration

Two (2) Years

Funding

Private/Donations

Cost

$2,000,000

Client

Illinois College – Jacksonville, Illinois

Macon WW

Macon Wastewater

Development of a Facility Plan to address the disinfection of the wastewater treatment facility. 

Funding

MoDNR SRF Low Interest Loan

Cost

$980,000

Client

City of Macon, Missouri

Beardstown WWTP Phase 1

Beardstown WWTP Improvements

Phase 1 – New Headworks

Size

8 MGD

Funding

IL DCEO/CDAP Grant
IEPA SRF Low Interest
Loan $3.2 Million
IEPA SRF Debt
Forgiveness $1.5 Million

Cost

$4.7 Million

Client

Beardstown Sanitary District – Beardstown, Illinois

Scotland County Water Main Installation

Scotland Co. Water Main

The project consisted of installation of approximately 73,000 feet of 8” transmission water main and Booster Pump Station upgrades as well as the installation of a new remote read metering system. The new main and pump station improvements allow the District to better feed the system and improve the hydraulic operating conditions of their existing elevated water storage tank. A new cellular read metering system was installed and included replacing all 1,350 meters in the District.

Funding

MDNR SRF Loan

Cost

$1,430,000

Client

Scotland County Consolidated Public Water Supply District #1 – Memphis, MO

Storm Drain

Grove/Kosciusko Storm Sewers

Planning documents, construction plans and specifications for a new storm sewer system for approximately 18 city blocks.

Funding

City Funds

Cost

Construction: $950,000

Client

City of Jacksonville, IL

Kirksville WTP

Kirksville Water Treatment

Services provided the design and construction phase services to update several of the core systems to allow the city to produce up to 6 MGD of potable water.

Size

6.0 MGD

Funding

MoDNR SRF Loan

Cost

$3.2 Million

Client

City of Kirksville, MO
Jacksonville Pool

Nichols Park Swimming Pool

  • Bath house renovation
  • Ventilation and new windows
  • Replacement of all plumbing and fixtures
  • Exterior lighting
  • Portions of pool deck replaced
  • New zero-depth entry wading pool

Funding

IDNR/OSLAD Grant
Local Funds

Cost

$538,000

Client

City of Jacksonville, Illinois