Chandlerville Water Tank

Chandlerville Water Tank

The project consisted of removal of the old storage tank and foundation, installation of a new 150,000 gallon potable water standpipe, site piping, and, electrical and telemetry transfers.

Funding

IPEA SRF Low Interest Loan
DCEO Grant

Cost

$397,000

Client

Village of Chandlerville, Illinois

Franklin Water Tank

Franklin Water Tank

The project included a new 125,000 gallon elevated water storage tank with necessary 6″ and 8″ transmission mains and necessary upgrades to existing SCADA/telemetry system.

Funding

IPEA Loan/DCEO/CDAP Grant

Cost

$970,524

Client

City of Franklin, Illinois

Cherokee Water Tank

Cherokee Tank Rehabilitation

B&A assisted the City with the successful application to the Illinois Environmental Protection Agency (IEPA) for a low interest loan. The project included the complete removal of the interior and external paint coating system along with the application of a new painting system.

Funding

IPEA Low Interest Loan
Debt Forgivness

Cost

$629,550

Client

City of Taylorville, Illinois

Chandlerville Water Treatment Plant

Chandlerville Water Treatment

Water Treatment facility construction included a 200 gpm iron and manganese removal filtration plant, raw and finished water connecting mains, two raw water detention tanks, and the addition of an emergency generator.

Size

200 GPM

Funding

IEPA Loan/DCEO Grant

Cost

$1,263,000

Client

City of Chandlerville, Illinois

Winchester Water Treatment Plant

Winchester Water Treatment

Water Treatment upgrades included construction of a new 500 gpm well and filtration plant, a Zeolite softening building, a SCADA system, and an emergency generator.

Size

500 GPM

Funding

IEPA Loan/Grant

Cost

$2,384,000

Client

City of Winchester, Illinois

MacMurray College Football Field and Track

Football Field and Track

This project provided civil/site services included new home bleachers and press box and the relocation of home bleachers. There was also extensive grading of the banks to improve maintenance and aesthetics.

Funding

MacMurray College funds
Alumni donations
Illinois Legislative Initiative Grant

Cost

$750,000

Client

MacMurray College – Jacksonville, IL

SMG Water Tank

SMG Water Cooperative

50,000 gallon water storage tank
Above grade booster pump station and building
SCADA/telementry system
314,000 LF of 6″, 4″, and 3″ PVC water main

Funding

USDA-RD
DCEO

Cost

$2,778,000

Client

Scott, Morgan, Greene (SMG) Water Cooperative

Whipple Hall

Whipple Hall

Services included structural inspection, structural design and detailing of the conversion of the 1882 structure to a combined use library, classroom and office.

Duration

Two (2) Years

Funding

Private/Donations

Cost

$2,000,000

Client

Illinois College – Jacksonville, Illinois

Macon WW

Macon Wastewater

Development of a Facility Plan to address the disinfection of the wastewater treatment facility. 

Funding

MoDNR SRF Low Interest Loan

Cost

$980,000

Client

City of Macon, Missouri