MoDNR SRF grant $825,000
MoDNR SRF loan
Cost
$1.66 million
Client
Macon Municipal Utilities – Macon, Missouri
MoDNR SRF grant $825,000
MoDNR SRF loan
$1.66 million
Macon Municipal Utilities – Macon, Missouri
The project consisted of removal of the old storage tank and foundation, installation of a new 150,000 gallon potable water standpipe, site piping, and, electrical and telemetry transfers.
IPEA SRF Low Interest Loan
DCEO Grant
$397,000
Village of Chandlerville, Illinois
The project included a new 125,000 gallon elevated water storage tank with necessary 6″ and 8″ transmission mains and necessary upgrades to existing SCADA/telemetry system.
IPEA Loan/DCEO/CDAP Grant
$970,524
City of Franklin, Illinois
B&A assisted the City with the successful application to the Illinois Environmental Protection Agency (IEPA) for a low interest loan. The project included the complete removal of the interior and external paint coating system along with the application of a new painting system.
IPEA Low Interest Loan
Debt Forgivness
$629,550
City of Taylorville, Illinois
Water Treatment facility construction included a 200 gpm iron and manganese removal filtration plant, raw and finished water connecting mains, two raw water detention tanks, and the addition of an emergency generator.
200 GPM
IEPA Loan/DCEO Grant
$1,263,000
City of Chandlerville, Illinois
Water Treatment upgrades included construction of a new 500 gpm well and filtration plant, a Zeolite softening building, a SCADA system, and an emergency generator.
500 GPM
IEPA Loan/Grant
$2,384,000
City of Winchester, Illinois
This project provided civil/site services included new home bleachers and press box and the relocation of home bleachers. There was also extensive grading of the banks to improve maintenance and aesthetics.
MacMurray College funds
Alumni donations
Illinois Legislative Initiative Grant
$750,000
MacMurray College – Jacksonville, IL
50,000 gallon water storage tank
Above grade booster pump station and building
SCADA/telementry system
314,000 LF of 6″, 4″, and 3″ PVC water main
USDA-RD
DCEO
$2,778,000
Scott, Morgan, Greene (SMG) Water Cooperative
Services included structural inspection, structural design and detailing of the conversion of the 1882 structure to a combined use library, classroom and office.
Two (2) Years
Private/Donations
$2,000,000
Illinois College – Jacksonville, Illinois
Development of a Facility Plan to address the disinfection of the wastewater treatment facility.
MoDNR SRF Low Interest Loan
$980,000
City of Macon, Missouri