Passavant ER

Passavant Emergency Addition

B&A  provided civil/site services including topographic and property surveys, subsurface utility locating and surveying, site grading, landscaping, parking area lighting, site utilities, parking areas, traffic movements, ambulance drive, entrance loading/unloading area, retaining walls and ADA accessibility.

B&A also prepared stage demolition and construction plans to allow the existing facility to remain operational throughout the construction of the new addition.

Size

22,000 SF

Funding

Passavant Area Hospital

Cost

$11 million

Client

Passavant Area Hospital – Jacksonville, IL

Unionville Sewer

Unionville Sewer Collection System Improvements

Assistance in annual reporting to MoDNR to identify and mitigate sources of inflow and infiltration to the wastewater collection system. Recommendations included manhole rehabilitation, sewer main replacement, sewer main lining, and construction of a relief sewer.

Funding

MoDNR CWSRF Grant – $777,000
MoDNR CWSRF low interest loan- $777,000
CDBG Grant – $500,000

Cost

$1,900,000

Client

City of Unionville, Missouri

Safe Routes to School Sidewalk Improvements

Safe Routes to School

The Safe Routes To School (SRTS) program assists communities who want to create a safe and healthy walking/biking environment for its students. Each SRTS project included the removal, replacement, and construction of sidewalks. All sidewalk ramps at intersections are ADA compliant.

Funding

Federal Grant
Local Funds

Client

Waverly, IL; Virden, IL; Divernon, IL

Waynesville Bridge

Flood Study and Bridge

Evaluation of major flood event, recommendations to mitigate future flooding, design and construction phase engineering of a new bridge.

Funding

Flood Study – City Funds
Bridge Construction – FEMA Hazard Mitigation Grant/City Funds

Cost

Flood Study – $75,600
Bridge Construction – $315,000

Client

City of Waynesville, Missouri

Chandlerville Water Treatment Plant

Chandlerville Water Treatment

Water Treatment facility construction included a 200 gpm iron and manganese removal filtration plant, raw and finished water connecting mains, two raw water detention tanks, and the addition of an emergency generator.

Size

200 GPM

Funding

IEPA Loan/DCEO Grant

Cost

$1,263,000

Client

City of Chandlerville, Illinois

Winchester Water Treatment Plant

Winchester Water Treatment

Water Treatment upgrades included construction of a new 500 gpm well and filtration plant, a Zeolite softening building, a SCADA system, and an emergency generator.

Size

500 GPM

Funding

IEPA Loan/Grant

Cost

$2,384,000

Client

City of Winchester, Illinois

Brasher Wastewater

Brashear WWTP Improvements

  • Sludge removal from existing lagoon
  • Increase in storage capacity
  • Conversion to Fixed Head Spray Irrigation system
  • Eliminated the existing NPDES permit requirements for effluent disinfection and the anticipated requirement for ammonia removal.

Funding

$150,000 CDBG Grant
$660,000 MDNR SRF Grant
$485,000 MDNR SRF Loan

Cost

$1,295,000

Client

City of Brashear, Missouri
MacMurray College Football Field and Track

Football Field and Track

This project provided civil/site services included new home bleachers and press box and the relocation of home bleachers. There was also extensive grading of the banks to improve maintenance and aesthetics.

Funding

MacMurray College funds
Alumni donations
Illinois Legislative Initiative Grant

Cost

$750,000

Client

MacMurray College – Jacksonville, IL

SMG Water Tank

SMG Water Cooperative

50,000 gallon water storage tank
Above grade booster pump station and building
SCADA/telementry system
314,000 LF of 6″, 4″, and 3″ PVC water main

Funding

USDA-RD
DCEO

Cost

$2,778,000

Client

Scott, Morgan, Greene (SMG) Water Cooperative