Taylorville Lift Station

Taylorville Lift Station Improvements

Improvements consisted of the upgrade/rehabilitation of nine (9) lift stations. B&A provided on-site construction observation; project shop drawing review; and construction contract management and documentation, including review of pay estimates and change orders in accordance with City and Illinois EPA-SRF Standards and Practices.

Funding

IL DCEO/CDAP grant
IEPA SRF low interest loan
USDA-RD loan

Cost

$1,450,000

Client

City of Taylorville, Illinois

Chapin WWTP

Chapin WWTP Improvements

Removal of all lagoon and sand filter sludge, replacement of the existing aeration system with a new fine bubble easily cleaned and maintained system.

Funding

DCEO Grant – $483,600

Cost

$553,100

Client

Village of Chapin, Illinois

Eagle Creek Park

Eagle Creek State Park

The Eagle Creek improvement project consisted of multiple sidewalks, a large patio area, a landscape block retaining wall, access to the patio with steps as well as an ADA vertical lift, and 57 boat slips with electrical hookups and ADA accessibility.

Funding

State of Illinois (CDB/IDNR)

Cost

$1,750,000

Client

Capital Development Board and Illinois Department of Natural Resources (Using Agency)

Chandlerville Water Treatment Plant

Chandlerville Water Treatment

Water Treatment facility construction included a 200 gpm iron and manganese removal filtration plant, raw and finished water connecting mains, two raw water detention tanks, and the addition of an emergency generator.

Size

200 GPM

Funding

IEPA Loan/DCEO Grant

Cost

$1,263,000

Client

City of Chandlerville, Illinois

Winchester Water Treatment Plant

Winchester Water Treatment

Water Treatment upgrades included construction of a new 500 gpm well and filtration plant, a Zeolite softening building, a SCADA system, and an emergency generator.

Size

500 GPM

Funding

IEPA Loan/Grant

Cost

$2,384,000

Client

City of Winchester, Illinois

Brasher Wastewater

Brashear WWTP Improvements

  • Sludge removal from existing lagoon
  • Increase in storage capacity
  • Conversion to Fixed Head Spray Irrigation system
  • Eliminated the existing NPDES permit requirements for effluent disinfection and the anticipated requirement for ammonia removal.

Funding

$150,000 CDBG Grant
$660,000 MDNR SRF Grant
$485,000 MDNR SRF Loan

Cost

$1,295,000

Client

City of Brashear, Missouri
Macomb City Bus Transfer and Parking

Macomb City Center Transfer & Parking

Preparation of construction plans and contract documents for a 60 vehicle parking lot, a pedestrian canopy with wind shields, lighting, support electrical, sidewalks, landscaping, and fencing.

Duration

5 months

Cost

$570,000

Client

McDonough County Public Transportation

Macon WW

Macon Wastewater

Development of a Facility Plan to address the disinfection of the wastewater treatment facility. 

Funding

MoDNR SRF Low Interest Loan

Cost

$980,000

Client

City of Macon, Missouri

Beardstown WWTP Phase 1

Beardstown WWTP Improvements

Phase 1 – New Headworks

Size

8 MGD

Funding

IL DCEO/CDAP Grant
IEPA SRF Low Interest
Loan $3.2 Million
IEPA SRF Debt
Forgiveness $1.5 Million

Cost

$4.7 Million

Client

Beardstown Sanitary District – Beardstown, Illinois