Winchester Water Treatment Plant

Winchester Water Treatment

Water Treatment upgrades included construction of a new 500 gpm well and filtration plant, a Zeolite softening building, a SCADA system, and an emergency generator.

Size

500 GPM

Funding

IEPA Loan/Grant

Cost

$2,384,000

Client

City of Winchester, Illinois

Brasher Wastewater

Brashear WWTP Improvements

  • Sludge removal from existing lagoon
  • Increase in storage capacity
  • Conversion to Fixed Head Spray Irrigation system
  • Eliminated the existing NPDES permit requirements for effluent disinfection and the anticipated requirement for ammonia removal.

Funding

$150,000 CDBG Grant
$660,000 MDNR SRF Grant
$485,000 MDNR SRF Loan

Cost

$1,295,000

Client

City of Brashear, Missouri
Dallas City Sewer

Dallas City Sanitary Sewer

Rehabilitation and replacement of the city’s original 1900’s vitrified clay pipe sanitary sewer mains.

  • 16,000 LF Sewer Main Rehab
  • 500 LF Sewer Replacement
  • 165 Lateral Connections Grouted
  • 45 Manholes Rehabilitated

Funding

$450,000 IL DCEO Grant
30% IEPA SRF principal Forgiveness
1.32% IEPA SRF Loan

Cost

$1.2 Million

Client

City of Dallas City, IL

SMG Water Tank

SMG Water Cooperative

50,000 gallon water storage tank
Above grade booster pump station and building
SCADA/telementry system
314,000 LF of 6″, 4″, and 3″ PVC water main

Funding

USDA-RD
DCEO

Cost

$2,778,000

Client

Scott, Morgan, Greene (SMG) Water Cooperative

Macomb City Bus Transfer and Parking

Macomb City Center Transfer & Parking

Preparation of construction plans and contract documents for a 60 vehicle parking lot, a pedestrian canopy with wind shields, lighting, support electrical, sidewalks, landscaping, and fencing.

Duration

5 months

Cost

$570,000

Client

McDonough County Public Transportation

Macon WW

Macon Wastewater

Development of a Facility Plan to address the disinfection of the wastewater treatment facility. 

Funding

MoDNR SRF Low Interest Loan

Cost

$980,000

Client

City of Macon, Missouri

Beardstown WWTP Phase 1

Beardstown WWTP Improvements

Phase 1 – New Headworks

Size

8 MGD

Funding

IL DCEO/CDAP Grant
IEPA SRF Low Interest
Loan $3.2 Million
IEPA SRF Debt
Forgiveness $1.5 Million

Cost

$4.7 Million

Client

Beardstown Sanitary District – Beardstown, Illinois

Jacksonville Pool

Nichols Park Swimming Pool

  • Bath house renovation
  • Ventilation and new windows
  • Replacement of all plumbing and fixtures
  • Exterior lighting
  • Portions of pool deck replaced
  • New zero-depth entry wading pool

Funding

IDNR/OSLAD Grant
Local Funds

Cost

$538,000

Client

City of Jacksonville, Illinois

Colchester WWTP

Colchester Wastewater

  • Lagoon modifications
  • New treatment system
  • Collection system rehabilitation
  • New storm sewer

Size

0.17 MGD

Funding

USDA-RD Public Infrastructure
40% Grant, 60% Low Interest

Cost

$1,982,000 – Wastewater Treatment Plant
$1,558,000 – Collection System

Client

City of Colchester, Illinois

Industry WWTP

Industry WWTP Improvements

  • Lagoon modifications
  • New treatment system
  • Collection system I/I reduction

Size

75,000 gpd

Funding

Illinois EPA SRF
35% Principal Forgiveness, 65% Low Interest Loan

Cost

$1,900,000

Client

Village of Industry, Illinois